Mongolia 1,000t/d Gold Mineral Processing Plant
pending update

Burundi 1200t/d Gold Mineral Processing Plant

According to the site data provided by the client, Xinhai Mining EPC supplied this project with EPCM+O. The scope of design work contained: the gold ore heavy separation, the construction drawing design of cyanide mining processing plant (including tailings pond ), including the design of the production workshop of the processing plant, involving water supply and drainage, electricity, civil construction, general drawing and other specialties. The powder ore contained 0.26% copper, 3.1g/t gold, 43.41% iron and low content of other elements. The core ore contained 0.90 g/t gold, 25.45% iron, and low content of other elements. The gold was the mainly recovered elements.

XINHAI SOLUTION

MAIN EQUIPMENT

PROJECT RESULT

The core is ground to 85% of -200 mesh. Lime was used as protective alkali, sodium cyanide dosage was 1.5kg/t, leaching time was 16h, and gold leaching rate was 80.00%.

SUCCESSFUL CASES

RELATED NEWS

Contact Us

To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.

  • Please fill in the Material

    • Gold
    • Silver
    • Copper
    • Iron
    • Lead
    • Zinc
    • Molybdenum
    • Chrome
    • Manganese
    • Nickel
    • Tin
    • Wolfram
    • Antimony
    • Barite
    • Fluorite
    • Feldspar
    • Graphite
    • Zircon
    • Lithium
    • Quartz
    • Others
xinhai