Simultaneously, Xinhai utilizes advanced 3D Design Software to perform modular and combined design for equipment, non-standard parts, and pipelines. In the production workshop, Xinhai has developed various processing fixtures and combination modules to achieve standardized manufacturing of modular and combined designs. Furthermore, by simulating the installation process management and integrating plans with BIM (Building Information Modeling), Xinhai has broken through traditional installation process management methods. This approach enables Xinhai to grasp project construction dynamics at any time, precisely manage installation information, and control project progress, thereby further enhancing installation and commissioning process management capabilities. Through this digital installation guidance method, the overall installation and commissioning work for the mine becomes more convenient.
-
3D Modular Design
-
Synchro 4D Progress Management