PROJECT RESULT
In the first phase of this project, the grade of lead concentrate was 69.02%, zinc concentrate was 51.02%, the productivity of lead concentrate was 2.88%, zinc concentrate was 4.71%, the recovery rate of lead concentrate was 90.00%, the recovery rate of zinc concentrate was 89.00%. In the second phase, the grade of raw ore declined. But the property of raw ore remained the same, the recovery rate and the grade of the concentrate remain the same except that the production of lead, zinc concentrate and silver decreased from year to year.