PROJECT RESULT
For civil engineering, steel structure was adopted for ore bins, platforms and foundations on the ground as far as possible. Original dump leaching tank was utilized. Despite of cultural differences and challenges in civil construction and equipment installation, Xinhai maintained close communication with the client, earnestly answered the client’s questions and modified the drawings according to particular field conditions. For equipment installation and commissioning, experienced staff were sent to provide technical guidance for the client, which significantly shortened the construction duration. As a result, the project’s economic benefits exceeded the expectations and were well received by the client.